Results 1 to 5 of 5

Thread: Prime liquid cooling work

  1. #1
    Join Date
    Apr 2008
    Posts
    53

    Prime liquid cooling work

    I'm beginning to mount the following system:
    Motherboard ASUS STRIKER FORMULA II - 780th nForce SLI
    CPU E8500
    No. 3 Asus 8800GTX Video Cards
    Thermaltake 1200W power supply

    VH6000 Thermatake homes.
    These are the kit for the cooling liquid:
    Kit 240:
    Ybris-Cooling - Kit Ybris EVO 2X 240

    A pair of AirBox for mounting the radiator outside the case (the first teams on one hand the radiator and the other sets of 4 holes in the rear fan.)
    Ybris-Cooling - conveyor AirBox

    2 connections pass
    Ybris-Cooling - pass connection with HOSE CARRIER cfz 2 pieces

    3 waterblock K7 for video
    Ybris-Cooling - Ybris black-K7

    chip video cards (especially the chip conversion video)
    Ybris-Cooling - Home Page.

  2. #2
    Join Date
    Dec 2007
    Posts
    996
    Azz that system, I do not think that I am the best suited to give advice in this area, but in principle if you put the radiator above, then you could fit down the pump and then follow the VGA1, VGA2, VGA3, CPU, radiator, Bowl, put in series with a sort of "circle".

    Or another order could be pumping just before the radiator, then CPU, VGA1, VGA2, VGA3, tank or pump, radiator, the VGA, CPU and bowl.

    I think that the first of the three is better, but I do not have enough experience on this.

  3. #3
    Join Date
    Apr 2008
    Posts
    53
    For matters of space so as not to sacrifice the slot houses dvd, cd, and harddisk I preferred to mount the radiator at the top of the 2 houses installing a suction fan above and the other in placing under (with a conveyor).

    Unless I misunderstood, I would like confirmation on the assembly of tubing that in my case mount in the series. I have CPUs and Video Cards.
    I enter the pipe .............. starting from where?

  4. #4
    Join Date
    May 2008
    Posts
    656
    The radiator should mount at least two fans in extraction from homes, better than one, considering that there is so much heat to go in this configuration. I do not know if space permits.

    The system in general is quite challenging to make quiet, but we see that we can do.....you're with the Dremel?

    We await further actions, in the meantime you can report updates to the assembly.

  5. #5
    Join Date
    May 2008
    Posts
    666
    Imagine the third card or cpu as seen temperatures reach the hot liquid arrives. The radiators should be made after 1 up to 2 waterblock. I pump, cpu, scheda1, radiator, scheda2, tab 3, radiator. Then bowl if you should put between the last radiator and the pump.

Similar Threads

  1. Liquid Cooling Buying
    By spookshow in forum Guides & Tutorials
    Replies: 2
    Last Post: 29-12-2010, 07:53 AM
  2. Need some opinion to get a liquid cooling
    By Aniela in forum Hardware Peripherals
    Replies: 5
    Last Post: 16-12-2010, 02:37 AM
  3. Which is the most popular liquid cooling kit
    By Susquehannock in forum Polls & Voting
    Replies: 6
    Last Post: 12-08-2010, 03:21 PM
  4. Setup Liquid Cooling
    By Rambo in forum Overclocking & Computer Modification
    Replies: 3
    Last Post: 28-08-2009, 08:04 PM
  5. How Liquid-cooling Works
    By RogerFielden in forum Overclocking & Computer Modification
    Replies: 3
    Last Post: 13-04-2009, 12:06 PM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Page generated in 1,718,812,520.26289 seconds with 16 queries