I have a schedule that for some reason the durations on multiple tasks have been increasing by a day at a time at random times. I can't figure out why and there doesn't seem to be a pattern.
The duration of the schedule has been getting longer, but we figured it was from adding new tasks that had popped up after we baselined the schedule. But we put three different versions of the schedule up together and noticed that the durations were getting longer even though we didn't increase them. I printed the file at two and at three when I opened it in the conference room, the durations had increased again.
It was originally created in 2010, but I have 2007. I don't know if that has been an issue, though. I couldn't find anything about a similar problem when I googled it. I know there are issues when printing in the network diagram when going from 2007 to 2010, so that's why I'm thinking it's a compatibility issue, but what do I know? It could also have something to do with saving it to a share drive.
If anyone knows how to stop this, please let me know!
Thanks
Bookmarks