I want to know a way to import a number of tasks from an excel spread sheet to an existing project file. This file has been set with a WBS structure and outline level set to the WBS, so it is possible to import the new data to automaticall sort to an outline level set by the WBS ID that will be included in an excel file? Can anyone let me know about same? Thanks.