    Import data from excel to MPP and set to outline levels

    I want to know a way to import a number of tasks from an excel spread sheet to an existing project file. This file has been set with a WBS structure and outline level set to the WBS, so it is possible to import the new data to automaticall sort to an outline level set by the WBS ID that will be included in an excel file? Can anyone let me know about same? Thanks.

  2. #2
    Join Date
    Aug 2005
    Posts
    822

    Re: Import data from excel to MPP and set to outline levels

    Actually, what project handles at such an import is the Outline Level field. After that importing that should be able to create the WBS.

  3. #3
    Join Date
    Jul 2004
    Posts
    153

    Re: Import data from excel to MPP and set to outline levels

    Thanks for the reply, I have now added a column 'outline level' into the existing excel spread sheet and then set outline levels as required to import to project. But for some reason after the import to MPP, some of the values set in the excel spread sheet as an outline level have changed but not all? Any information on such would be helpful.

  4. #4
    Join Date
    Aug 2005
    Posts
    822

    Re: Import data from excel to MPP and set to outline levels

    Lets say for example, if a Task with OLL 2 is followed by a task with OLL 4, then MS Project wont be able to handle that. OLLs only jump one at the time and the 4 will be changed into a 3. That might in turn influence the next ones.

  5. #5
    Join Date
    Jul 2004
    Posts
    153

    Re: Import data from excel to MPP and set to outline levels

    Thanks for the response, I am going to try out some tests and see what happens exactly. I guess that the import and carrying out the outlining should be done manually.

Similar Threads

  1. Excel 2007 Data Import via Bloomberg
    By YajasK in forum MS Office Support
    Replies: 2
    Last Post: 09-02-2012, 07:24 PM
  2. Import data from one excel worksheet to another
    By arjun rantu in forum Windows Software
    Replies: 4
    Last Post: 28-11-2010, 12:28 AM
  3. Import data from Excel with main tasks and subtasks
    By Franseza in forum Microsoft Project
    Replies: 2
    Last Post: 03-06-2010, 03:30 PM
  4. How to Import all text data in Excel spreadsheet
    By racer in forum Tips & Tweaks
    Replies: 1
    Last Post: 06-01-2010, 10:38 PM
  5. How do i import Excel data from password protected site
    By Axton in forum Networking & Security
    Replies: 3
    Last Post: 21-10-2009, 05:10 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Page generated in 1,714,094,910.91737 seconds with 18 queries